DescriptionReach C12 is 10.2 miles long and extends from the Rosebud Bridge at RM 225 downstream to RM 215. The reach classified as Partially Confined Meandering with Islands (PCM/I), indicating some influence of the valley wall, a main meandering channel thread,and numerous meander cutoffs that have generated large islands. The reach is relatively dynamic; at RM 221.5 for example the riverhas migrated over 900 feet to the northwest since 1950. At RM 217.2R, the river migrated over 300 feet between 2001 and 2011. Most of the rapid migration is on the outer edges (apices) and downstream limbs of large meanders.TypeTextGenredocumentsLanguageeng Date2016-03-16SubjectRivers--MontanaYellowstone RiverYellowstone River WatershedContributing InstitutionMontana State LibraryGeographic CoverageYellowstone RiverMontanaDigital CollectionYellowstone River Corridor StudyDigital Formatapplication/pdfDigitization SpecificationsBorn PDF documentsCopyrightCC0